Bloomberg News

TVA’s Browns Ferry 3 Pushes U.S. Nuclear Output Higher

February 21, 2013

Nuclear-power generation rose for a third day in the U.S. as output increased at the Tennessee Valley Authority’s Browns Ferry plant.

Nationwide production climbed 0.2 percent to 85,953 megawatts, or 84 percent of capacity, according to U.S. Nuclear Regulatory Commission data compiled by Bloomberg. Output was 1.7 percent lower than a year ago with 15 of 104 reactors offline.

Browns Ferry 3, a 1,115-megawatt unit, operated at 19 percent of capacity today. The reactor, about 32 miles (51 kilometers) west of Huntsville, Alabama, had been shut since Feb. 11 for maintenance on the condenser cooling water system.

Unit 2, which will close in mid-March for refueling and maintenance, was at 91 percent of capacity, down from 92 percent yesterday. Browns Ferry 1 operated at full power. The three units can produce as much as 3,284 megawatts combined, the second most in the U.S.

Output in the Southeast increased 0.7 percent, a third straight gain, while production in other regions was unchanged.

Reactor maintenance shutdowns, usually undertaken in the U.S. spring or fall when energy use is at its lowest, may increase consumption of natural gas and coal to generate electricity. The average refueling down time was 46 days in 2012, according to the Nuclear Energy Institute.

To contact the reporter on this story: Kenneth Christensen in New York at kchristense9@bloomberg.net

To contact the editor responsible for this story: Dan Stets at dstets@bloomberg.net


Steve Ballmer, Power Forward
LIMITED-TIME OFFER SUBSCRIBE NOW
 
blog comments powered by Disqus